A budget variance is the difference between a budgeted amount and the corresponding actual result. It shows where performance differed from the plan and provides a starting point for investigation. A variance can relate to revenue, cost, profit or another budgeted measure. The comparison needs the same period, scope and basis.
A favourable variance improves profit relative to the comparison, while an adverse variance reduces it. Thus spending less than the appropriate cost allowance can be favourable, whereas earning less revenue can be adverse. A positive or negative arithmetic sign is not enough without knowing the convention and the item being compared. State both the amount and whether it is favourable or adverse.
For a small business owner in England, the explanation matters more than the label alone. Lower spending might reflect efficiency, but could also mean delayed maintenance or lower output. Where variable costs depend on activity, comparison with a budget flexed to actual activity can avoid confusing a volume change with spending performance. One total difference may contain several causes, some outside the manager's control.
Worked example, using invented monthly figures for an English workshop. The appropriate materials allowance for the actual output is £2,400 and actual materials cost is £2,650. Assume the figures cover the same work and period.
| Particulars | Working / amount |
|---|---|
| Cost allowance at actual output | £2,400 |
| Actual cost | £2,650 |
| Cost variance | £2,650 − £2,400 = £250 adverse |
The owner investigates price, usage and waste rather than assuming the whole £250 proves poor purchasing.