Expected value is a probability-weighted average of the possible outcomes of a decision. Each outcome is multiplied by its probability and the results are added. It is useful for comparing uncertain choices, including branches of a decision tree, but it is not a promise about what will happen on any single occasion.
Use outcomes measured on the same basis and include all the relevant possibilities. Probabilities for mutually exclusive, exhaustive outcomes must add to one. Keep returns, costs and net gains separate: if the outcome figures exclude an initial cost, that cost must still be deducted once. If they already include it, deducting it again would understate the result.
For a small business owner in England, examine the evidence behind the probabilities and the size of potential losses. A positive expected value can conceal a cash loss the business could not survive. The method also does not capture every non-financial consequence or the owner's attitude to risk. Test uncertain assumptions rather than giving a weak estimate false authority through arithmetic.
Worked example, using invented assumptions: an English trader assesses a promotion with a 0.6 chance of producing £2,000 and a 0.4 chance of producing £500, before a fixed £800 campaign cost.
| Particulars | Working / amount |
|---|---|
| Higher outcome contribution | 0.6 × £2,000 = £1,200 |
| Lower outcome contribution | 0.4 × £500 = £200 |
| Expected return before cost | £1,200 + £200 = £1,400 |
| Expected net gain | £1,400 − £800 = £600 |
The £600 is the probability-weighted net gain. Actual net gain would be £1,200 or a £300 loss under these assumptions, not necessarily £600.
