Over-absorption occurs when the overhead charged into production using an absorption rate exceeds the actual overhead incurred for the same period. It is a costing difference, not proof that customers have paid too much or that the business has received extra cash.
A predetermined overhead absorption rate normally uses budgeted overhead divided by budgeted activity. It is then applied to actual activity to calculate absorbed overhead. Differences arise when actual activity, actual expenditure or both differ from budget. Over-absorption can therefore reflect higher activity or lower spending; the total alone does not explain the cause.
The difference needs to be identified and treated appropriately in the costing accounts. Owners should compare like with like: the same overhead category, activity base and accounting period. A rate based on machine hours cannot be applied to labour hours without changing the meaning. Over-absorption is also different from charging direct materials or labour to a job.
Invented worked example: a workshop budgets production overhead of £24,000 and 6,000 machine hours. Actual activity is 6,500 machine hours and actual overhead is £25,000. These are teaching assumptions. The calculation shows that more overhead has been absorbed into output than was actually incurred, even though actual spending exceeded the original budget.
| Calculation | Result |
|---|---|
| Rate: £24,000 ÷ 6,000 machine hours | £4 per machine hour |
| Absorbed: 6,500 hours × £4 | £26,000 |
| Actual overhead | £25,000 |
| Over-absorption: £26,000 − £25,000 | £1,000 |