A special order is a one-off customer order considered separately from ordinary sales, often at a different price or on unusual terms. The short-term decision is whether accepting it improves the business's result compared with refusing it. Relevant costing focuses on the future cash flows that change because of the decision, including any benefit sacrificed elsewhere.
Where spare capacity exists, unchanged fixed overheads are not an extra cost of the order. Extra materials, labour, delivery or setup costs may be relevant. Where capacity is scarce, accepting the order may displace normal work, so the lost contribution is an opportunity cost. A price above variable cost is not automatically sufficient in every case.
In this invented worked example, a printer has spare capacity. A special order brings £1,000 of revenue, requires £600 of extra production costs and £100 of extra setup costs, and displaces no other work. It adds £300 to profit before tax, assuming all other costs remain unchanged. The example does not establish a sustainable price for regular sales.
For a small-business owner, check capacity, payment risk, delivery promises and the effect on existing customers before accepting. A low one-off price can create expectations or draw demand away from normal sales. Include every extra cost and any contribution lost, rather than spreading unchanged overheads across the order or ignoring a real capacity constraint. A short-term gain should fit the wider commercial relationship.
| Calculation | £ |
|---|---|
| Extra revenue | 1,000 |
| Less extra production costs | (600) |
| Less extra setup costs | (100) |
| Increase in profit: £1,000 − £600 − £100 | 300 |