Total cost is the combined cost of the resources included in a stated activity, output level or period. In a simple short-run cost model, it equals total fixed costs plus total variable costs. Fixed costs do not change with output within the relevant range, while total variable costs change as activity changes. The scope must be clear before two totals can be compared.
Total cost differs from average cost, which is cost per unit, and marginal cost, which concerns the extra cost of additional output. A business can have a higher total cost while producing each unit more cheaply. Costs also differ from cash payments: equipment purchases, credit terms and depreciation can make the timing of spending and recognised costs different. The calculation needs a consistent accounting or decision-making basis.
In this invented worked example, a small workshop has fixed costs of £1,200 for a period and variable cost of £8 for each of 150 units produced. Total variable cost is £1,200, so total cost is £2,400 and average cost is £16 per unit. The model assumes the stated fixed cost and variable rate apply at this output and includes no other costs.
For a small-business owner, identify what the total includes, the period covered and the expected level of activity. Avoid counting an allocated overhead twice or leaving out a cost because it was paid earlier. Check for step changes, such as needing another machine or supervisor, when output rises. For a particular decision, relevant additional costs may differ from the full accounting total. Total cost is useful only when its boundaries and assumptions are understood.
| Invented period calculation | Amount |
|---|---|
| Fixed costs | £1,200 |
| Variable costs: 150 × £8 | £1,200 |
| Total cost: £1,200 + £1,200 | £2,400 |
| Average cost: £2,400 ÷ 150 | £16 per unit |