A semi-variable cost contains both a fixed element and a variable element. It is also called a mixed cost. The fixed part remains payable over a stated range of activity, while the variable part changes with the activity level. This differs from a purely variable cost, whose total changes in direct proportion to activity under the assumed model.
A simple model is total cost = fixed cost + (variable cost per unit × activity). The activity measure must match the charge: it might be machine hours, calls or units processed. The relationship is an assumption for a defined range and period, not a guarantee that every real bill follows a straight line. Tariff bands and changes in capacity can alter the pattern.
In this invented worked example, a workshop pays a monthly equipment charge of £100 plus £2 for each machine hour. At 50 machine hours the variable element is £100 and the total is £200. The fixed charge remains even if no machine hours are used that month, under the assumed contract.
For a small-business owner, separate the two elements when forecasting a change in workload. Doubling activity would double the variable part, not the whole bill. Check the actual contract and recent invoices before applying the model, including minimum payments, included usage and thresholds. Calling a cost semi-variable describes how it behaves; it does not by itself show whether that cost is direct, avoidable or good value.
| Calculation | £ |
|---|---|
| Fixed monthly charge | 100 |
| Variable charge: 50 hours × £2 | 100 |
| Total monthly cost: £100 + £100 | 200 |
